Washington · Reference

Tier 2 readiness checklist

Last updated · Checked against primary sources

Download the checklist (PDF, 1 page)

17 items to have ready before a Tier 2 filing starts. Utility data is usually the slowest, so request it first.

Building facts

  • WA Building ID and the owner of record Commerce's notice letter or the Tier 2 Data Pool in the Clean Buildings Portal.
  • Gross floor area, excluding parking Measured to CBPS 008; sets Tier 2 coverage and the incentive amount.
  • Primary use and weekly operating hours The QEM needs these for the energy use intensity target (Form B).
  • Every electric and gas utility, with account numbers Each one must supply 12 months of data; tenants may need to authorize.

Access and people

  • Clean Buildings Portal account for the owner (SAW login) Every owner signs; one designated user prepares the application.
  • Shared access granted to whoever prepares the filing Lets a representative work without your password.
  • A named energy manager Develops and maintains the EMP and signs Form A. Can be staff or a contractor.
  • A Qualified Energy Manager (QEM) Required for Tier 2; reviews, sets the EUIt and signs Form A.

Energy data

  • ENERGY STAR Portfolio Manager property Create it or locate the existing one; note the Property ID.
  • 12+ months of whole-building energy use Request it from each utility now; this is usually the slowest step.

Operations and maintenance

  • Inventory of energy-using equipment HVAC, water heating, lighting, controls, refrigeration, envelope; nameplate photos work.
  • Preventive-maintenance task list and frequencies Per manufacturer guidance; the O&M Program Development Tool is optional.
  • Proof the PM is happening Completed PM logs, CMMS screenshots or a current signed PM service contract. Repair invoices alone do not count.

Plan and incentive

  • Energy Management Plan, signed by the owner Commerce template optional; attach the EMP reporting tool.
  • O&M reporting tool completed Mandatory attachment to the compliance application.
  • W-9 ready for each participating utility Utilities pay the incentive and most ask for one.
  • Multifamily rentals: Exhibit A and a rent schedule Only for the enhanced incentive; no tenant names or personal data.

Want it done for you? Send the address and floor area to hello@cleanbuildingsassociates.com for a free coverage check and incentive estimate.