Washington · Preparing the filing
Energy Management Plan
Last updated · Checked against primary sources
Short answer
What does a Tier 2 Energy Management Plan need?
A written plan, kept by an energy manager the owner designates and signed by the owner every year, that tracks the building's energy use against its target and sets out how energy is managed. It includes the O&M program and is reported on Commerce's mandatory EMP reporting tool. Commerce's template is optional.
Key factsChecked October 27, 2026
- Standard
- CBPS Section 5, explained in CBPS 037 CBPS 037
- Written by
- The energy manager the owner designates CBPS 037
- Owner signature
- Reviewed and signed annually CBPS 037
- Reporting tool
- Mandatory; attached to the application Commerce Tier 2 page
- Template
- CBPS 039, optional CBPS 039
What the plan must contain
Summarized from CBPS Section 5 and Commerce guidance CBPS 037:
| Element | What it means in practice |
|---|---|
| Energy accounting | Energy use tracked in ENERGY STAR Portfolio Manager. |
| Baseline | EUI and weather-normalized EUI for the initial compliance year. |
| Annual updates | Net energy use, EUI and weather-normalized EUI, each year. |
| Comparison to target | Annual EUI against the EUIt. Tier 2 buildings without a target use Portfolio Manager's national median. |
| Operating changes | Occupancy, weekly hours and schedules: original, current, and their effect on energy use. |
| Audit measures | Recommended energy efficiency measures from any audit, and those implemented. |
| Occupant information | How occupants are told to use windows, thermostats and lighting efficiently. |
| Training plan | Energy-related training for the people who operate and maintain the building. |
| Capital plan | Equipment to replace with efficient, ENERGY STAR equipment where applicable. |
| Contact list | Efficient-equipment suppliers, a qualified energy auditor, the energy manager and the owner. |
| Lighting schedule and survey | Lighting power density, savings potential and a satisfaction survey. Not required after a utility-program lighting upgrade in the last five years. |
| O&M program | Included in the EMP. See O&M program and proof. |
| Annual access and signature | Shared with occupants and stakeholders each year; reviewed and signed by the owner each year. |
Easy to miss
- The owner's dated annual signature inside the plan.
- A record of how the plan was made available to occupants.
- The lighting schedule and survey, when lighting has not been upgraded through a utility program in five years.
- A training plan specific to the building's systems, not a generic statement.
Templates
Commerce's EMP template (CBPS 039) is optional; an existing plan is fine if it meets the standard. The EMP reporting tool is mandatory and is attached to the compliance application. See a sample EMP page (fictional building).
Want it done for you? Send the address and floor area to hello@cleanbuildingsassociates.com for a free coverage check and incentive estimate.